Move-VM
has a -RunAsync
parameter, which looks like it ought to do what you need.
How can I move multiple VMs in parallel using powercli?
-
04-08-2022 - |
Question
Right now, I'm using the following scriptblock to move VMs in parrallel:
Start-Job -ScriptBlock {
Add-PSSnapin VMware.VimAutomation.Core
Add-PSSnapin VMware.VimAutomation.License
Add-PSSnapin VMware.DeployAutomation
Add-PSSnapin VMware.ImageBuilder
Connect-VIServer MyVIServer
Move-VM -VM $vm -Destination $TargetHost
}
This doesn't seem very efficient, and doesn't completely work (the jobs never complete). I shouldn't have to add the snap-ins and connect to the VIServer every time, but I don't know if there is a way around it. Is there any way to move multiple VMs at the same time and monitor when they have completed?
Also, the each VM won't necessarily go to the same ESX host, so I need to run the Move command separately for each one.