I'm using Excel to bulk edit a group of work items in TFS 2012.

I can add a Link to a Parent work item on each record, but only if I do it line-by-line.

Is there a way that I can link a Parent to a group of work items?

有帮助吗?

解决方案 2

I was able to accomplish this by changing my query to result a Tree View, and also include the Parent work items.

其他提示

You have to go the other direction. If you open the parent work item and add a 'Child' link, you can specify a list of work item ids to make children. enter image description here

许可以下: CC-BY-SA归因
不隶属于 StackOverflow
scroll top