I"m working with flow job scheduling issue. is there a mathematical equation to compute the fitness instead of the Gantt Chart ? thanks in advance.

有帮助吗?

解决方案

It seems the most common fitness measure would be the make span. Specifically you would be minimizing the total length of the schedule (Smaller make-span --> better fitness).

许可以下: CC-BY-SA归因
不隶属于 StackOverflow
scroll top