Frage

I would like to adopt sample, well-known demo in JFreeChart showing memory consumption : http://www.koders.com/java/fidAC2CC42CB6511A1240DFE1A6BE1B9D04D34CF001.aspx

Problem:
I don't want it to be initially stretched between both ends of the plot and when the maximumItemAge is reached begin to "scroll".
I want the time range to be of the constant width, and the measurements representation starting with the left side left blank, filling the plot from the right.

Scrolling after filling-up the whole plot (free.setMaximumItemAge(MAXIMUM_AGE);) is perfectly fine with me.

I've already tried bunch of staff involving setRange(.., ..) and setAutoRange(false).
Seems it's more tricky as the TimeSeries are used

War es hilfreich?

Lösung

You just need to add the following line: domain.setFixedAutoRange(MAXIMUM_AGE);

That will fill your plot from the right and scroll when it's full.

Lizenziert unter: CC-BY-SA mit Zuschreibung
Nicht verbunden mit StackOverflow
scroll top