How can I modify a Work Item type to include additional information in TFS?
Question
TFS2008. I'd like to track task points on a Task work item, but there isn't anywhere (other than the description) to record this. I'd like to add a dropdown with 0, 1, 2, 3, 5, 8, etc, so these task points can be exported in reports.
Solution
Use the process template editor, available as part of the Visual Studio Team System 2008 Team Foundation Server Power Tools.
OTHER TIPS
I created a web cast awhile ago that demonstrates this tool. it covers a couple of really basic scenarios. It can be accessed here.
Ta.
Steve Porter
Licensed under: CC-BY-SA with attribution
Not affiliated with StackOverflow