Set an incrementing default for a work item field
-
29-05-2021 - |
Question
We want to set the iteration path to a default our tree structure is as follows
Root
- v10.1
- v10.2
- v10.3
So we want it to prefill with the latest (v10.3) on creating each new work item.. and in future when we add v10.4 it would then pre-fill that instead.
Are either the default or dynamic update to new iteration paths possible?
Solution
It is not possible to have a rule in your work item to default the iteration path. That said, in TFS11 iterations are first class citizens: they have dates.
The product now knows what is the current sprint/iteration for a team. If you create a new work item in the context of that team it will default the iteration path with that iteration.
See more on teams in TFS11 at http://msdn.microsoft.com/en-us/library/hh528603(v=vs.110).aspx