Consider the following scenario.

You currently have a feature set A you wish to extend to include feature set B. In the near feature there's a high possibility that you wish to extend this even further to include feature set C.

  • Option 1) Cost to extend A -> B is minimal, but high maintenance costs.
  • Option 2) Cost to refactor A and B to make more logical sense is moderate, but low maintenance costs.

Extending to include feature set C:

  • Cost to extend refactored(A & B) -> C is minimal, again low maintenance costs.
  • Cost to extend A,B -> C is high, (both to refactor and extend).

Assuming the inclusion of feature set C is beyond the scope of the current sprint, how do you go about choosing an option?

How does this change if the addition of feature set C is several (2 or more) sprints out?