Remove: Change Order New
-
28-10-2019 - |
문제
I Have a Sharepoint Envirioment with several content types. I have in my context menu a button for changing the contenttype order. How can i disable this button.
I want to remove this button from the context menu?
해결책
Disable the option in the documentlibrary: allow modifying content type
제휴하지 않습니다 StackOverflow