TFS 2008: How do I change the default state for a Work Item?
-
26-09-2019 - |
문제
How do I change the default state for a Work Item? I tried changing the transition with no source, but it still says "Active" as the default. I tried renaming the Active state to "Proposed", but it still says "Active".
해결책
Either method would have worked, if I had restarted Visual Studio. Simply disconnected and reconnecting to the TFS Server isn't enough to clear the cache.
제휴하지 않습니다 StackOverflow