문제

I have two questions:

  1. According to this article if I define some future iterations (i.e. iterations with dates set in the future) then I should see them listed on the left hand side under the heading 'Future'. But I don't see anything:

    Product Backlog

  2. I assume this problem is related, but I'm hoping to get the forecasting setup as per this article, but as shown in the screen shot below I'm getting an error.

도움이 되었습니까?

해결책

Are the future iterations checked? There is a checkbox next to iterations in Iterations window - see screenshot.

라이센스 : CC-BY-SA ~와 함께 속성
제휴하지 않습니다 StackOverflow
scroll top