문제

Let's say your team is working on 10 features/fixes for a sprint. At the end of the sprint, there are one or two things that the product owner does not accept. But, they would really like the other 8 or 9 to be released.

How do you handle this? Using subversion, what would be the best methodology to manage a sprint with the possibility that this could happen?

올바른 솔루션이 없습니다

라이센스 : CC-BY-SA ~와 함께 속성
제휴하지 않습니다 softwareengineering.stackexchange
scroll top